A parking lot looks like a small line item until it fails. Asphalt cracks under sun, freeze and water, the surface wears, and potholes form at the drains and the edges. Left alone, the lot becomes a liability for residents and visitors and a claim against the owner. The good news is that a lot follows a predictable path: routine maintenance keeps it sound for years, and then a larger job restores it.
This guide explains how to plan the work on an apartment property's lot, how to price it per square foot and how to put the reserve in the deal's plan so investors see it before it comes due.
Raising for an apartment deal? Start free
What is the routine maintenance?
- Crack filling each year, before water gets under the surface.
- Sealcoating every two to three years in most climates, to slow the aging of the surface. Some owners wait longer, and some climates call for more frequent work.
- Striping and signs for parking spaces, accessible spaces and fire lanes. These are easy to forget and easy to get wrong.
- Pothole repairs as they appear, which are cheaper when done early.
These items are operating costs or repairs, depending on the work. Ask your CPA how each one is classified in your deal.
When does a lot need resurfacing?
A resurfacing or rebuild replaces the surface, and sometimes the base. It is needed when the cracks run through the base, when the surface has large sections that have broken away or when water sits in low spots after rain. A condition report from a paving contractor or an engineer should say which of these applies.
A full rebuild is a larger project than a resurfacing. Ask the contractor to say which the lot needs and why, because the answer changes the price more than almost any other choice.
How do you price it?
Measure the lot, including the drive aisles, the spaces, the sidewalks and the dumpster pad, and get the square footage from the site plan or a survey. Then ask for a bid per square foot for each task, plus the striping and the demolition of the old surface.
Include a contingency. The base can be worse than the surface suggests. A 10 to 15 percent allowance for a resurfacing is a common starting point, and it should be checked against the contractor's core samples.
Hypothetical example
These figures are made up for illustration. Use your own bids and site survey.
A 60,000-square-foot lot has a few cracked sections and water pooling near one drain. The engineer recommends a mill and overlay, not a full rebuild. The bid is $3.50 per square foot for the overlay, $3,000 for the drain repair, $2,500 for striping and $14,000 for sealcoating after the overlay is cured.
| Item | Amount |
|---|---|
| Mill and overlay (60,000 sq ft at $3.50) | $210,000 |
| Drain repair | $3,000 |
| Striping | $2,500 |
| Sealcoating | $14,000 |
| Contingency at 10 percent | $22,950 |
| Total | $252,450 |
The owner plans the work in the first year of the value-add plan, after the leases are signed and before the summer season. The routine crack filling and a sealcoat every three years go in the operating budget at a steady annual amount, so investors can see both the big project and the everyday cost.
What should you check before you commit?
- The site plan and any recorded easements, so the work stays inside the property's lines.
- The local permit rules for paving and drainage work, and any storm water rules that apply.
- Accessible parking, fire lane and striping rules, which must be met after the work.
- Whether the lender requires a reserve for paving or a specific inspection.
- A phased schedule that keeps resident access, emergency vehicle access and the trash pickup working.
How DoorRaise fits in
DoorRaise helps sponsors raise equity for apartment buildings with 5 or more units under Rule 506(b) or 506(c). The deal's budget shows the resurfacing as a capital item and the routine work as an operating cost, so investors see both. DoorRaise does not select paving contractors or judge the lot's condition. Setup is $1,500 (non-refundable), and the administration fee is $5,000 a year from closing.
Start with a sponsor page or see the fees.
FAQ
How often should a lot be sealcoated?
Many owners plan every two to three years, depending on the climate and the traffic. Ask the paving contractor for the schedule that fits your lot.
Is resurfacing a repair or a capital expense?
A full resurfacing is usually a capital improvement. Routine sealcoating and striping are usually repairs or maintenance. Ask your CPA how your deal treats each one.
Who pays for a lot that the resident damaged?
The lease and the local rules decide that. Do not count recovery from a resident as a source of money in the budget.
Can I wait longer to resurface?
Sometimes, if the lot is sound and the routine work is kept up. Waiting too long turns a resurfacing into a rebuild, which costs more. Use the engineer's report to decide.
Sources
- Capital expenditures vs. operating expenses in apartments, for how to classify the work.
- Apartment capital plan and replacement reserve draws, for how the reserve pays for large projects.
- Apartment operating budget in the first year, for where routine maintenance sits.
- Example figures are hypothetical. No paving price, drainage rule or local permit requirement is cited here.
This article is general information, not legal, tax or investment advice. Talk to a securities attorney and a CPA about your deal. DoorRaise is not a law firm, broker-dealer, investment adviser or funding portal.